Related Case Studies


WA 140

Project size: 5 towers
Team size: 6 person
Duration: 35 days
Description: The structure consist of elements such as Angles & Plates. The project consist of transmission tower with all 4 legs unequal. This made tough to model the project.

VIEW DETAILS

Lone Cactus

Project size: 31 tons
Team size: 4 person
Duration: 25 days
Description: The structure is of Rail Terminal Dump Building. The structure consist of elements such as Beam, Stair, Handrail, Guardrail with toe plate, Ladder, Anchor Bolts, Anchor Base Plates, Gratings.

VIEW DETAILS